LLC "Kronospan UA", production of chipboard

Novovolynsk, Volyn region

- Installation of equipment and metal structures of the electric filter of neutralization of emissions
- Complex of works on modernization (mechanical dismantling and installation) of the equipment of the section of pressing of chipboards of the chipboard line
- Reconstruction of main oil pipelines of thermal oil
- Supply and installation of main and on-site compressed air

Installation of solid fuel boiler 11 MW:

  • Design, supply and installation of main thermal oil pipelines
  • Design, manufacture and installation of galvanized metal structures and overpasses

Engineering communications:

  • design and installation of pipelines and hydrants of the fire extinguishing system of the main production complex;
  • design and installation of automatic cable heating systems for technological pipelines and equipment
  • installation and thermal insulation of thermal oil pipelines.
  • installation of equipment and pipelines of pneumatic transport systems

Technological boiler house VOT (high-temperature organic heat carrier):

  • working design of the technological boiler house VOT with a capacity of 4 MW
  • installation and strapping of technological equipment of the boiler room
  • manufacture and installation of technological metal structures
  • manufacture and installation of thermal insulation of thermal oil pipelines
  • commissioning of boiler and pumping equipment. Commissioning

Technological equipment and facilities:

  • design, manufacture and installation of wood chips silos with a capacity of 160 to 400 cubic meters.
  • dismantling of the equipment of shop of crusher of wood raw materials
  • design, manufacture and installation of metal structures for maintenance of technological equipment
^